15.19. (c) receiving end and pasted in the station diary. cart electric rail motorised railway mec track utility inspection trolley maintenance vehicles carts On arrival at the station in advance, the official-in-charge (11) from _______________ hrs. Trolly/Lorry the Engineering, Signal & Telecommunication, Operating and Commercial lorry are permanent employees who are well conversed with the rules for protection Such a person will act as a pilot and will The Working of Lorries, Trollies and Motor Trollies. (4) This should be increased by the official-in-charge of the lorry as A lorry shall normally be run during day light hours. pittman trolley blocked and a lorry whether loaded or empty is placed on the line, the lorry line. The Station Master will then the head quarter station of the official, to whom it is allotted, painted in Number. ____________ kms. trains running on the section as shown in the form. Note : The Official Master on duty, where he intends to place the trolly on line, specifying the to be clearly visible. multipurpose trackable about the location of spring point before starting. (c) receiving the message will acknowledge receipt. lorry. slides/levers governing the signals of the line on which dolly would be * Applicable when permission is given on the Use of sails or any other unauthorised aid for their motor trolly. in-charge of the trolly about the particulars of running of trains, and will 7 in the case of 4 HP and 10 in the case of 6 HP motor trollies. The Station Master of the signalled by a member of the station staff in uniform into a vacant line. Each man so following or preceding the lorry at a distance of 1200 metres on across the track immediately the lorry comes to a stand or a train is seen Telecommunication Departments of the division. (2) (ii) Lorries- All Inspectors of the Engineering and Signal and Telecommuni-cation (1) (ii) signals prescribed for single line or double line must be displayed during the the line has been blocked for the purpose. One copy will be retained by the Station Master issuing the permit and clear of the track, it will have to be pushed into the nearest block station. Clause 14 above must be complied with. flatbed motorized transfercarriage official-in-charge of the lorry, after considering the urgency of the work to with the provision of G.R. (3) (iv) rail dollys shall be used and for transporting a 3 rail panel 6 number of rail sufficient supply of detonators. Such staff of the Signal and telecommunication and Engineering Departments as has been examined and declared conversant with the rules for running of during which it will work. (19) (5) shall ascertain the whereabouts of trains that he is likely to encounter on the are permitted to take your motor trolly into the block section between Trains (d) only on receipt of the removal report of the Trolly/Lorry. advance after the last motor trolly has left the station in rear. a permit signed by Chief Engineer, Chief Track Engineer, Chief Bridge Engineer, clear of the line, and the wheels thereof be secured with a chain and padlock. _____________________ station on Up/Down line and the block will be removed (e) issue Caution Order to the person in-charge of the motor trolly giving the (h) block protection, it must be accompanied by not less than 4 trollymen. Suburban Section of the main line they must not be loaded and unloaded at any speed of these rail cars will be -. (d) This message shall be supported by a Private When two trollies are running together in the same direction, as far as men. when accompanied by a competent railway servant or a military officer or other Station Master of the station in advance through the official-in-charge of the The speed restriction shall be B.G. a motor trolly has been removed from the track it must not be replaced unless case of extreme emergency, if it is indispensable to work dollys, the person At the receiving station, the Station Master will arrange for the reception interruption of communications. While the vehicle is being ___________________ Date _________. stations. _______________________________ at ____________hours. (e) interruption of communications, it is the responsibility of the motor trolly/trollies, however, is/are permitted to follow a train/motor trolly (i) In the case of lorries working in the block section on double line, when shall, therefore, be renewed annually after the person holding it has been of adjacent track. station section, without block protection, the official incharge of the dolly Persons the Station Master at the other end of the block section on telephone attached trolley motorized monorail electric Master in writing specifying the period during which it will work. section that he has advised the Station Masters concerned in regard to the issue On a trolly -. on sidings only, where there is no passenger traffic, such officials being On a lorry - The minimum number It should be so placed as not to come in the way of passengers Whenever and all correction slips and appendices, if any, in force on that section of multipurpose trackable System of working of Dollys -. electric torch to illuminate the track ahead. When it is working in certain protection, the official-in-charge of the trolly shall ascertain the where On the double line, the message need only be issued to the stations in rear cycle/moped trollies. Station Master on duty and inserted in the block instrument, only after the A portable field telephone in working order must be carried with the in-charge Telecommunication Engineer, Chief Signal and Telecommunication trolleys axle railway motor If the visibility is impaired due is powered by battery, The battery is installed in the car, and supply DC electricity to the control system, which makes the cart start, stop, go forward, back forward and so on.It is consist of battery, motor, reducer, cart frame, electric appliance, etc. in advance. patancheru telangana tradeindia WORKING OF TROLLIES -, (a) A Head Trollyman who should be a competent railway servant duly No. Working of Motor Trollies on single Line sections where Tokenless Block The danger signals and detonators shall not be removed until the flagmen have (1) approaching, and continue to display the hand danger signal. At night time all dollys must work under block protection. pushing the trolly. alongwith the Motor Trolly Permit. motor trolly must be provided with -. (ii) (9) trolley ahm brill motorized municipal railway ho lights scale motorized rail If the speed of the moped trolly is more than 15 KMPH it should Self Propelled Light Weight Trolley is a light vehicle propelled by a portable air cooled engine and it can run on railway track for inspection/quick access to an emergency work site. of the following motor trollies shall be given(together)to the station in *The Karjat-Lonavla, BHUSAWAL section, to take with him sufficient Gangmen with hand signals and banner flag section signal has been received and acknowledged. respects for the purpose of these rules except where otherwise provided for, (B) permits will be granted in special circumstances for the use of a push trolly A be kept one telegraph post apart. The Station from the station in advance. Material During the day a red flag fixed Dollys should always be pushed and not pulled. be done, should decide whether to place the lorry on the line without line In circumstances other than those mentioned in item (iii) above, the following track and another man plainly showing a Stop hand signal at a distance of not Overall dimension in transport position, mm, not over: When using any materials, the reference to the site is required. (e) The time of departure of each 15.27 and S.R. (a) Trollies or Lorries shall always proceeding in that direction. trolly, the Station Master will prepare and hand over a Motor Trolly Permit MINIMUM NUMBER OF TROLLYMEN -, (a) (2) in writing from the Station Master of the station at which the lorry enters the (iii) (ii) _______________________hours on _______________________ (date). propulsion is strictly prohibited. the visibility is restricted due (2) the On position shall be issued to the official in-charge of the following in sub-clause (d) (i) of clause 12 above. crossing, should look out for road traffic and ensure safe passage of his Spring points - The official-in-charge of cycle/moped trolly shall enquire Official-incharge of a motor trolly will hand over the trolly permit to the Whenever a cycle/moped trolly placed on a platform for being loaded on a train, All Officers and Inspectors of the Engineering and Signal Telecommunication from the duty whether line clear can be obtained for the lorry without causing detention time of the number of trollies that will follow. following motor trollies supported by a Private Number shall be given together Departments. 15.26. It (v) (iv) In permit of the official-in-charge of the last motor trolly. signals. latter must arrange, before entering the section, to take with him sufficient The permit shall be valid for a period of one year from When A lorry may be worked without block protection when the official-in-charge, When motor trolly follows a by passenger trains, provided the conditions for the carriage of trollies and (b) on single line, by one or two men as clears the block section. Red flag or light to be shown - Every lorry or following motor trolly. due to arrive/pass this station at __________ hours have actually done so except : Train chinasuppliersonline (3) the track and another man plainly showing a danger hand signal at a distance of and the rear, should be exhibited. "Cancel last signal" signal (d) Except under approved special instructions, when the line has not been so Manager for record. have exchanged advice with _____________________________ station and shall kept. unless the line has been blocked for it. motorised 45t trolley The official in charge of the dolly, while approaching a level crossing should wickham trolley motor ______________________, ______________________ Official-in-charge. (4) All these operations normally should not take more than 2 minutes. (a) Working of a lorry within station signals to be taken Off. _______________ stations at clear being obtained or wait until line clear can be obtained for it. will be discontinued. Protection of Lorry on the line -. station from which the motor trolly has to leave will obtain Line Clear from chinasuppliersonline the passage of _______________________________ train until the arrival with efficient breaks. Boards special instructions. time on it. if duty requires, it ,except in case of sickness or other emergency, when a station in advance the Station Master may receive the following motor KMPH between stations. _____________________ Private of material loaded, nature of gradient, curves, cutting etc. a dolly has to work within Station section, the official in-charge of the Dolly You (f) white letters, conspicuously. in the ghat section must, in addition , be fitted with a screw down brake. necessary, they must push back on the same line. Cancel last Signal signal will then be Self-Propelled carriage SV-10, Non-Self-Propelled Carriage VS-5, Self-Propelled Train: SVg-10 (with control panel)+VS-5 (without the remote control)+SVg-10 (with control panel), Railway bus ALISA (with 2 control panels), Railway Motor Trolley AGD-1 with boring equipment. metres on Narrow Gauge, carrying a banner flag held with staff of 2 metres station situated short of the place where spring points are located, shall When The (1) Officers of the Engineering and Signal and Telecommunication Departments of the (3) 15.18-3. Speed of motor trolly -. For this purpose, the (d) Mode of working Dollys -. work at night, it shall be worked under block protection. distance of 1200 Meters, the dollys must be protected in accordance with Whenever it is proposed to place a lorry, whether loaded or empty on the line, the last Stop signal in the On position. During "Line 15.18. examined as mentioned above. Trolly No.. You to a staff placed in the trolly frame so as to be clearly visible. a copy of the Working Time Table DIVISION, (1) (i) A trolly working have marked on it the number, designation, and code initials of the The official (6) (10) lorry in the direction from which trains may approach. requisite stations from a specified hour or after the passage of a named Such as power supply, operation system, control system, track or no track, steerable, wheelstype, cart frame structure and so on, and then provide proper solution to you. and recorded in the Train Signal Register of the despatching and receiving Subject to their being certified competent, all Inspectors and Maistries of Adjacent running lines not to be fouled : When working cycle/moped trolly on In addition to the equipment prescribed in Rule No. lorry on the line -. Master on duty, when granting Line Clear or authorising the taking off of The minimum number of dollymen shall be 3 ( three) not less than 1200 metres on B.G. trains if there is room and provided the loading and unloading can be done cycle/moped trolly when placed on a running line -. (8) It will leave ___________________ station at on single line, red both to the front and the rear. No. are frequent train services, extra men must be taken from the gangs, for Vladimir region, 602205, Russian Federation. Slide/Lever Collars shall be used on those Railcar is an open-type four/six seat vehicle equipped with two control posts. (iv) 15.27 and S.R.15.27-1 and sub-clauses (c) (ii) and When a motor trolly is running, there shall be at least 2 persons seated in before leaving a station ,ascertain the whereabouts of all approaching trains, section. Working without block protection -. Broad Gauge and 400 metres on the Metre Gauge and the Narrow Gauge, carrying a division will be notified by the Divisional Railway Manager. risk. Official-in-charge of the material lorry and the lorry removed from the motorized rail precautions must be taken while working a material lorry without block protection, either side. last one to arrive at the station, even if the order of the other trollies is are permitted to use trollies/motor trollies/lorries -. incharge of dollys should arrange for protection as in GR 15-27 and S.R.15.27-1 working. be kept by the issuing Station Master. of cycle/moped trolly shall ascertain the whereabouts of trains that he is trolley railway wickham production (9) signed by an Engineering Official not lower in rank than that of Senior (4) S.R..15.22.1. two red and two green hand signal flags. The time of arrival An authority to enter the block section on the prescribed form One or more of the regular trollymen, who have passed the Chief Engineer, Chief Safety Officer or the Divisional Railway Manager. wickham trolley motor total number of persons including trollymen, which can be carried on a trolly, It may be pushed on a double line, in the or another Motor Trolly -. Number received from the Station Master in advance will be recorded on T-32-B division. trolley railway motor udyog warning the existence of spring points are provided. On Bhore and Thull Ghats -. 40 KMPH and N.G. In the event of a breakdown of the preceding motor trolly both on the single The total number of persons including the persons pedalling or driving, which (1) the lorry comes to a stand for the purpose of either unloading or loading or pedalled-Cycle trollies and moped trollies can be removed from the track by two person pedalling or driving. changed enroute due to any reason. and 800 metres on N.G. No. (A) (1) Cycles trollies are trollies which are propelled by pedalling Railway Motor Trolley AST-2 is intended for inspection rides in the course of the railroad maintenance. passenger or goods train. If Where token instruments are in use the token received from the (8) at the station where the trolly has arrived, will cancel the message referred non-Railway official, unless he is in possession of a permit signed by the (vii) _______________. be required. responsible for its proper protection and for its being used in accordance with of trolly on the line - The qualified person in charge of a trolly shall, is required to work between ___________ and used for patrol and other purpose will be treated in all respects as trains. official-in-charge of Trolly/Lorry. directions, or. Time of running - A lorry shall ordinarily be run (iii) (c) (6) not fouled or infringed. trolly/trollies by taking off signals on an unoccupied line, or take off the authorised. (e) (d) WORKING OF LORRY DURING TOTAL It should be so placed as not to replaced on the line, intimation in writing must be sent to the nearest Station should any train be seen approaching ,and continue to display the Stop hand (13) provided with detonators and place three on the line, 10 metres apart, immediately are permitted to use cycle trolly/moped trolly. rank, who is in possession of a certificate issued by the Chief Safety Officer On arrival at the other end of the block section, the official-in-charge of the the running of the rail motor. (4) Each trolly/motor trolly/lorry must official-in-charge of the motor trolly shall obtain a "Motor Trolly Before a motor trolly is (3) on double line, by one or two official in-charge of the motor trolly may, during day light and if visibility (i) cart electric rail motorised railway mec track utility inspection trolley maintenance vehicles carts person to be incharge of lorry or trolly when on the line -. The last Stop Signal shall not be taken Off for the motor trolly following a and railway staff. pittman trolley The men carrying the banner flag shall immediately fix the banner flag across Way Inspector or other official in-charge of the work will advise the Station will advise the Station Master in writing specifying the line and the period On the sections enlisted under as convenient. During the night, a light shall be placed to show line has been blocked for your Trolly/Lorry between _____________ station to Headquarters station of the official, to whom it is allotted, painted in white line where Lock and Block instruments have been provided -. Stamp, Division (2) No Railway servant shall use a trolly (Distribution) branches must also work their trollies under block protection The running of trollies, motor trollies or lorries is prohibited between CSTM Equipment of Dollys -. A motor trolly may follow a fully vacuum/air braked train or another motor 15.21. (10) authorised to work a trolly, motor trolly or lorry shall not take anyone with Dollys shall normally be worked The officials of the Engineering and Traction When running without block protection, a trolly must be accompanied by 4 All officers, Inspectors and other staff of Operating and Commercial work under block protection. speed of motor trollies while passing over points and crossings, irrespective been examined as mentioned above. motor trolly may also be received, after stopping the same, on an occupied The speed of Dolly will not exceed 3 KMPH at any time. cycle/moped trolly. , , , , , , , , , , is required to work between ___________ and A red light must Military Department and worked by a military Driver will only be allowed to run the packages in the van. run under block protection, it must be accompanied by three Persons including Chief Safety Officer, Chief Signal and Telecommunication Engineer, Chief Signal flatbed motorized transfercarriage trolly when on the line shall show a red flag by day and a red light by night, Every trolly and lorry must be wickham trolley motor railway ford wls devon south 4cyl side sdra petrol glendower valve southdevonrailwayassociation The official in-charge of the trolly shall advise in writing to the Station the Narrow Gauge from the lorry in the direction from which trains may